InfraBlades is building tomorrow’s infrastructure with circular projects across the Netherlands.
Pilot project
Reefbrug – Rotterdam
Together with the Municipality of Rotterdam, TU Delft and Haskoning, InfraBlades is developing the Reefbrug: a pilot project in Rotterdam-Zuid using decommissioned wind turbine blades as the primary structure for a new pedestrian bridge.
The timber bridge in Zuidwijk is due for replacement, making this project a concrete example of circular construction in the Dutch civil engineering sector.
Status: Design and testing phase | Type: Pedestrian bridge | Client: Municipality of Rotterdam
Bridge project
Boezembrug – Pijnacker-Nootdorp
Commissioned by the Municipality of Pijnacker-Nootdorp, InfraBlades is developing the Boezembrug: a new bridge project using decommissioned wind turbine blades as the primary structure for a pedestrian bridge.
This project marks an important next step towards applying wind turbine blades in mainstream infrastructure projects. InfraBlades is currently working with the municipality and main contractor on further development towards construction.
SMART-Blades: testing protocol for structural reuse
The biggest obstacle to scalable wind turbine blade reuse isn’t the material, but how it is assessed: how do you reliably demonstrate that a blade is structurally suitable for a second life? SMART-Blades is developing the missing standard.
Together with TU Delft and GROW, InfraBlades is developing a practical inspection and testing protocol that is reproducible, cost-effective and applicable in practice. This method gives clients, contractors and engineers the certainty needed to apply blades safely and at scale.